Thursday, February 3, 2011

Nadine Jansen Swimsuit



LIMW Airport "Corrado Gex" - Aosta

Airport "Corrado Gex" - Aosta
At the end of January 2011 work began modeling at the regional airport in Valle d'Aosta "Corrado Gex".

When was modeled the control tower, whose windows are illuminated at night, also equipped with obstruction lights in the top three.







E 'was also necessary to remodel the taxiways and the apron with Taxidraw and then run Terragear.
We will let you know when the files of the buildings will be loaded on the FlightGear Repository (and therefore available on TerraSync). To see
TerraSync on the new layout of the airport it will take, unfortunately, much longer, because it must be made within the Terragear for the centralized database which supports TerraSync.

files of the tile "data / Scenery / Terrain / e000n40/e007n45" are for download from the site of " Scighera "







Upgrade to 07/02/2011

737-300 Air is before the new hangar
The control tower is substantially completed ... There is also the anemometer running:)
After completing the three old hangars (the green): all three have doors that close at sunset!
script in "nasal" I was specially written by "ot-666" ... very, very nice!
E 'well being finalized even the hangar again ...






Update on 10/02/2011
To date the following buildings have been modeled, which were sent to the Central Repository and are available for download on the website of " Scighera "
Control Tower ... Download








Hangar 1
doors slide closed position at the sunset!
(The script in "nasal" was kindly provided by Oliver Thurau, callsign on FG: ot-666)
Download




Hangar 2
doors slide in the closed position at the sunset!
(The script in "nasal" was kindly provided by Oliver Thurau, callsign on FG: ot-666)
Download




Hangar 3
doors slide closed position at sunset!
(The script in "nasal" was kindly provided by Oliver Thurau, callsign on FG: ot-666)
Download




Hangar 4, the new one .. no, this hangar doors remain closed! Download







The Clubhouse / Restaurant in wood ..












And finally the fence, which extends along the north side of the airport.
The gate closes at night and reopen in the morning ... while the bars are raised and lowered every minute!








LIMW Aerial photography of Aosta, taken from F-sig February 10, 2011:


A video of Sonny:

0 comments:

Post a Comment